V2 Installation Guide
Steps to Install Fuellox
- Install the pulse meter
- Mount the Fuellox Unit
- Fuellox Bowser, jump to step 11.
- Wire up the Pulse meter
- Wire up the pump
- Wire up other control elements
- Nozzle switch
- E Stop
- Level Monitor
- Connect to 12V Power
- Power up the unit
- Configure the Fuellox hardware
- Calibrate the Pulse Meter
- Commission and test the system
- Handover to the end user
- Platform familiarization
- Troubleshooting
- FAQ’s